top of page
Lyons Street Rehabilitation and Drainage Works
Hinchinbrook Shire Council
Langtree Consulting prepared the detailed design and documentation for the rehabilitation and drainage design works for Lyons Street. The project is to upgrade Lyons Street to an 8m wide sealed typical urban standard road and resolve the drainage issue (water ponding) occurred fronting property number 2 Lyons Street. The design works includes drainage issue investigation, road geometry design, hydrology and hydraulic assessment, pavement and seal design, design options analysis, cost estimate and design options presentation to Council.
bottom of page